{"id":266,"date":"2007-03-21T23:36:27","date_gmt":"2007-03-22T04:36:27","guid":{"rendered":"http:\/\/fiveforks.com\/ted\/2007\/03\/to_do_list\/"},"modified":"2007-03-21T23:36:27","modified_gmt":"2007-03-22T04:36:27","slug":"to_do_list","status":"publish","type":"post","link":"https:\/\/www.fiveforks.com\/ted\/2007\/03\/to_do_list\/","title":{"rendered":"To Do List"},"content":{"rendered":"<p>This is the list of things I asked <A HREF=\"\/ted\/files\/mt\/archive\/2007\/mom_the_builder.html\">mom<\/A> to turn her attention toward, in order. Until I run out of money or get tired of it.<\/p>\n<p>Master Bathroom: Replace shower and shower tile.Reglaze remaining wall tiles white. Install a new toilet. Install new floor tile. Repaint walls and repair plaster in the hallway and bedroom where the shower leaked.<\/p>\n<p>Main Bathroom: Replace sink with either a pedestal or hanging sink. Replace medicine cabinet. Replace the toilet. Replace or refurbish the existing tub and tile. Install new shower\/bath plumbing and fixtures. Reglaze wall tile white. Paint walls, repair ceiling damage. Replace bathroom cabinets or at least fix them up. Replace attic pull-down steps.<\/p>\n<p>Replacing carpet in back room with tile or wood flooring (Susan has some tile I can buy). Replace back door with full glass door. Reinstall other back door and finish trim. Replace linoleum flooring in the bay window. Remove old &#8220;window&#8221; air conditioner and patch over the hole. Replace all the vent registers in the house.<\/p>\n<p>Replace flooring, countertop, and sink in kitchen. Replace refrigerator and dishwasher. Remove wall paper and paint walls.<\/p>\n<p>Refinish floors in all 3 bedrooms. Replace wood paneling in guest bedroom with drywall (may need new trim and doors as well).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This is the list of things I asked mom to turn her attention toward, in order. Until I run out of money or get tired of it. Master Bathroom: Replace shower and shower tile.Reglaze remaining wall tiles white. Install a new toilet. Install new floor tile. Repaint walls and repair plaster in the hallway and &hellip; <a href=\"https:\/\/www.fiveforks.com\/ted\/2007\/03\/to_do_list\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;To Do List&#8221;<\/span><\/a><\/p>\n","protected":false},"author":15,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-266","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/posts\/266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/comments?post=266"}],"version-history":[{"count":0,"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/posts\/266\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/media?parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/categories?post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fiveforks.com\/ted\/wp-json\/wp\/v2\/tags?post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}